Tide Monitoring And Tide Gauge Installation

Reliable water level data for vertical control, chart datum, and dredging surveys

Reliable water level data for vertical control, chart datum, and dredging surveys

We provides tide gauge installation and tide monitoring across the UAE to support projects requiring accurate water level variation, vertical referencing, and survey corrections for bathymetry and coastal works.

Why tide monitoring matters

Tide data is essential when your project needs:

  • Depths referenced to a defined vertical datum (project datum / chart datum / municipality datum)
  • Consistent comparison of surveys (pre/interim/post dredge)
  • Engineering design inputs and reporting compliance
  • Verification of water level behaviour during critical activities

What we provide

  • Tide gauge installation
  • Continuous water level logging for agreed duration
  • Benchmark tie / datum checks
  • Data screening, processing, and reporting
  • Outputs for bathymetry correction and project documentation

Whether you require a river survey, seabed map, dredging calculation, or marine construction survey, our USV bathymetric surveying solutions provide accurate, safe, and cost-effective results.

Deliverables

  • Tide time-series plots and data tables
  • Summary report of water level variations and monitoring period
  • Correction-ready tide files
  • Documentation: installation details, photos, and methodology
  •  

Quality and control

  • Stable installation and protection plan based on site conditions
  • Time synchronization and logging verification
  • Data QA/QC and clear handling of gaps/outliers
  • Transparent datum references and assumptions in reporting
  •  

Our Process

  1. Confirm required datum, monitoring duration, and deliverables
  2. Install tide gauge and verify logging
  3. Monitor period and recovery
  4. Process data and deliver files + report

Frequently asked questions

Can tide data be used for dredging payment surveys?
Yes, when aligned to the project specification and datum requirements.

Do you always need a tide gauge?
Not always. Some projects use official tide stations or alternative vertical control methods—depends on scope.

Tide gauge installation and tide monitoring across the Gulf region for bathymetry corrections, vertical datum control, dredging surveys, and coastal offshore projects.

Contact us today to discuss your Tide Monitoring & Tide Gauge Installation requirements.

FALCON SURVEY ENGINEERING CONSULTANTS is a pioneering Survey Engineering Company in U.A.E. established in the year of 2007, Falcon Survey Engineering built on a strong work ethic, honesty and a commitment to relationships.

Contact Info

Social Links